
Reduce unplanned downtime

Extend equipment life

Minimize product loss

Enhance safety
Start smart. Shut down safer.
Pipewise enables controlled startups and shutdowns that reduce mechanical stress, extend equipment life, and lower maintenance-related OPEX.
3-4 weeks
Minimize pressure surges and transient damage
Reduce wear on pumps, valves, and compressors
Avoid unplanned downtime during transitions

Start smart. Shut down safer.
Faster response when it matters most.
Pipewise improves ESDV and BPCV operations to shorten response time during abnormal events, limiting product loss and environmental exposure.
3-4 weeks
Maintain optimal flow during normal operation
Isolate pipeline segments quickly during emergencies
Support confident, timely control-room decisions

Faster response when it matters most.
Prevent pressure excursions before they escalate.
Continuous overpressure monitoring reduces rupture risk and integrity threats by identifying abnormal pressure conditions before failures occur.
3-4 weeks
Detect pressure excursions in real time
Flag operating conditions that exceed safe limits
Protect against catastrophic pressure-related events

Prevent pressure excursions before they escalate.
Maximize flow. Minimize friction.
Pipewise optimizes DRA performance to increase throughput and reduce energy costs without capital investment in new infrastructure.
3-4 weeks
Improve flow efficiency across varying rates
Reduce pumping energy and friction losses
Prevent DRA overuse and chemical waste

Maximize flow. Minimize friction.
Know where the pig is, with certainty.
Automated pigging recognition reduces operational uncertainty and downtime by confirming pig passage and identifying hang-ups in real time.
3-4 weeks
Verify cleaning and inspection progress
Confirm pig passage and identify abnormal pig behavior
Improve planning of pigging intervals

Know where the pig is, with certainty.
Catch slack flow before it causes problems.
Slack flow monitoring improves flow assurance and protects equipment by detecting unstable gas- liquid conditions before they trigger damage or shutdowns.
3-4 weeks
Identify gas-liquid interfaces in real time
Reduce risk of cavitation and pump damage
Prevent emergency shutdown scenarios

Catch slack flow before it causes problems.
No wax buildup. No slowdown.
Detect paraffin deposition early to reduce cleaning costs and maintain reliable pipeline flow.
3-4 weeks
Detect wax accumulation before flow restriction
Optimize pigging and chemical injection schedules
Avoid unplanned cleaning or shutdowns

No wax buildup. No slowdown.
